Planning Documentation
Volume 1 Non-Technical Summary
Volume 2 - Main Chapters
- Preface - Volume 2
- Table of Contents - Volume 2
- Glossary Volume 2
- Chapter 1 - Introduction
- Chapter 02 - Need for the Proposed Scheme
- Chapter 03 - Reasonable Alternatives
- Chapter 04 - Proposed Scheme Description
- Chapter 05 - Construction
- Chapter 06 - Traffic & Transport
- Chapter 07 - Air Quailty
- Chapter 08 - Climate
- Chapter 09 - Noise and Vibration
- Chapter 10 - Population
- Chapter 11- Human Health
- Chapter 12 - Biodiversity
- Chapter 13 - Water
- Chapter 14 - Land, Soils, Geology & Hydrogeology
- Chapter 15 - Archaeological & Cultural Heritage
- Chapter 16 - Architectural Heritage
- Chapter 17 - Landscape & Visual
- Chapter 18 - Waste and Resources
- Chapter 19 - Material Assets
- Chapter 20 - Risk of Major Accidents
- Chapter 21 - Cumulative Impacts & Environmental Interactions
- Chapter 22 - Summary of Mitigation and Monitoring Measures
- Chapter 23 - Summary of Significant Residual Impacts
Volume 3 - Figures: Part 1 of 3
Chapter 4 Proposed Scheme Description
Volume 3 - Figures: Part 2 of 3
Chapter 4 Proposed Scheme Description
- 10. Junction Systems Design
- 11. Proposed Surface Water Drainage Works
- 12. IW Foul Sewer Asset Alterations
- 13. ESB Asset Alterations
- 14. GNI Asset Alterations
- 15. IW Water Asset Alterations
- 16. Telecommunications Asset Alterations
- 17. Combined Existing Utility Records
- 18. Bridges and Major Retaining Structures
Volume 3 - Figures: Part 3 of 3
Chapter 5 Construction
Chapter 6 Traffic and Transport
Chapter 7 Air Quality
Chapter 9 Noise and Vibration
Chapter 10 Population
Chapter 11 Human Health
Chapter 12 Biodiversity
Chapter 13 Water
Chapter 14 Land, Soils, Geology and Hydrogeology
Chapter 15 Archaeology & Cultural Heritage
Chapter 16 Architectural Heritage
Chapter 17 Landscape & Visual
Chapter 18 Waste & Resources
Chapter 21 Cumulative Impacts
Volume 4 Appendices Part 1 of 4
Chapter 2 Need for the Proposed Scheme Appendix
- Appendix A2.1 Planning Report Figures
- Appendix A2.1 Planning Report
- Appendix A2.1 Sub Appendix 1 Local Policy
- Appendix A2.1 Sub Appendix 2 Planning History
Chapter 4 Proposed Scheme Description Appendix
Chapter 5 Construction Appendix
Volume 4 Appendices Part 2 of 4
Chapter 6 Traffic and Transport Appendices
- Appendix A6.1 - Transport Impact Assessment
- Appendix A6.2 - Transport Modelling Report
- Appendix A6.3 - Junction Design Report
- Appendix A6.4 - Impact Assessments
- TIA - Sub Appendix 1 - Transport Modelling Report
- TIA - Sub Appendix 2 -.Junction Design Report
- TIA - Sub Appendix 3 - Maps
- TIA - Sub Appendix 4 - Impact Assessments
Volume 4 Appendices Part 3 of 4
Chapter 7 Air Quality Appendix
Chapter 8 Climate Appendix
Chapter 9 Noise and Vibration Appendices
Chapter 10 Population Appendices
- Appendix A10.1 - Schedule of Commercial Businesses
- Appendix A10.2 Economic Impact of the Core Bus Corridors
Chapter 12 Biodiversity Appendix
Chapter 13 Water Appendices
Chapter 14 Land, Soils, Geology and Hydrogeology Appendices
Chapter 15 Archeology and Cultural Heritage Appendices
Volume 4 Appendices: Part 4 of 4
Chapter 16 Architectural Heritage Appendix
Chapter 17 Landscape (Townscape) and Visual Appendix
Chapter 18 Waste and Resources Appendices
Chapter 20 Risk of Major Accidents and or Disasters Appendices
Chapter 21 Cumulative Impacts Appendices
Location Maps
Preferred Route Option Report
Preferred Route Option Report Appendices
- Preferred Route Option Report Appendix A - Preferred Route Drawings
- Preferred Route Option Report Appendix B - Public Consultation Submission Report - First Non-Statutory Public Consultation
- Preferred Route Option Report Appendix C - Public Consultation Submission Report -Second and Third Non-Statutory Public Con
- Preferred Route Option Report Appendix D - MCA Table for Cycle Facilities
- Preferred Route Option Report Appendix E - MCA Table for Liffey Valley Bus Stops
- Preferred Route Option Report Appendix F - Options Study Feasibility Report
- Preferred Route Option Report Appendix G - Emerging Preferred Route - 1st Non-Statutory Public Consultation - Brochure
- Preferred Route Option Report Appendix H - Draft Preferred Route - 2nd Non-Statutory Public Consultation - Brochure
- Preferred Route Option Report Appendix I - Updated Draft Preferred Route - 3rd Non-Statutory Public Consultation - Brochure
Preliminary Design Report
Preliminary Design Report Appendices
- Preliminary Design Report Appendix A - Designers Risk Assessments
- Preliminary Design Report Appendix B - Preliminary Design Drawings
- Preliminary Design Report Appendix B1 - Site Location Plan
- Preliminary Design Report Appendix B2 - General Arrangement
- Preliminary Design Report Appendix B3 - Mainline Plan and Profile
- Preliminary Design Report Appendix B4 - Typical Cross Sections
- Preliminary Design Report Appendix B5 - Landscaping-General-Arrangement
- Preliminary Design Report Appendix B6 - Pavement Treatment Plans
- Preliminary Design Report Appendix B7 - Fencing and Boundary Treatment
- Preliminary Design Report Appendix B8 - Traffic Signs and Road Markings
- Preliminary Design Report Appendix B9 - Street Lighting
- Preliminary Design Report Appendix B10 - Junction System Design
- Preliminary Design Report Appendix B11 - Proposed Surface Water Drainage Works
- Preliminary Design Report Appendix B12 - IW Foul Sewer Asset Alterations
- Preliminary Design Report Appendix B13 - ESB Asset Alterations
- Preliminary Design Report Appendix B14 - GNI Asset Alterations
- Preliminary Design Report Appendix B15 - IW Water Asset Alterations
- Preliminary Design Report Appendix B16 - Telecommunications Asset Alterations
- Preliminary Design Report Appendix B17 - Combined Existing Utility Records
- Preliminary Design Report Appendix B18 - Bridges and Major Retaining Structures
- Preliminary Design Report Appendix C - Deviations Departures Relaxations from Standards
- Preliminary Design Report Appendix D - Arboricultural Impact Assessment Report
- Preliminary Design Report Appendix E.1 - Geotechnical Report - PSSR
- Preliminary Design Report Appendix E.2 - Geotechnical Report - GIR
- Preliminary Design Report Appendix E.3 - Geotechnical Report - Ground Investigation
- Preliminary Design Report Appendix F - Existing Structures Study
- Preliminary Design Report Appendix G - Parking Survey Report
- Preliminary Design Report Appendix H.1 - Bus Stop Review Methodology
- Preliminary Design Report Appendix H.2 - Bus Stop Review Analysis
- Preliminary Design Report Appendix I - Accessibility Audit
- Preliminary Design Report Appendix J.1 - Preliminary Design Report ST01 - Liffey Valley Pedestrian Bridge
- Preliminary Design Report Appendix J.2 - Preliminary Design Report ST02 - Chapelizod Hill Road Bridge Widening
- Preliminary Design Report Appendix J.3 - Preliminary Design Report ST03 - Ballydowd Pedestrian and Cycle Bridge
- Preliminary Design Report Appendix J.4 - Preliminary Design Report - Hermitage Golf Club Retaining Wall
- Preliminary Design Report Appendix J.5 - Preliminary Design Report - TII Retaining Walls
- Preliminary Design Report Appendix J.6 - Preliminary Design Report - Non TII Retaining Walls
- Preliminary Design Report Appendix J.7 - Preliminary Design Report - Gantries
- Preliminary Design Report Appendix K - Drainage Design Basis Document
- Preliminary Design Report Appendix L - Junction Design Report
- Preliminary Design Report Appendix M - Road Safety Audit
- Preliminary Design Report Appendix N - Flood Risk Assessment
- Preliminary Design Report Appendix O - Preliminary Design Guidance Booklet
- Preliminary Design Report Appendix P - Structures File Note